Category
page 1Buildings and structures in Hamm
Hamm (Westf) Hbf
railway station in Hamm, Germany
THTR-300
The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, West Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down on 1 September 1989.
The THTR-300 served as a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW (Vereinigte Elektrizitätswerke Westfalen). The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissi
Hamm–Minden railway
railway line in Germany
Datteln-Hamm Canal
canal in Waltrop, Germany