Category
page 1Energy infrastructure completed in 2019
Belo Monte Dam
hydroelectric dam complex on the Xingu River in the state of Pará, Brazil
Chernobyl New Safe Confinement
containment structure for the nuclear reactor at Chernobyl, Ukraine

Xayaburi Dam
dam
Opole Power Station
coal-fired thermal power station in Poland
COBRAcable
COBRAcable (COpenhagen-BRussels-Amsterdam cable) is a ±320 kV, 700 MW HVDC submarine power cable pair between Eemshaven, the Netherlands and Endrup near Esbjerg, Denmark. The cable is jointly owned by Energinet.dk and TenneT. Its purpose is to improve the European transmission grid and thus increase the amount of variable wind power in the system while improving supply reliability. Its 700 MW capacity corresponds to an annual transmission capacity of 6.1 TWh.
Nemo Link
HVDC interconnector between Belgium and the United Kingdom