Category
page 1Former nuclear power stations in France
Marcoule Nuclear Site
nuclear site in the Chusclan and Codolet communes, France
Fessenheim Nuclear Power Plant
nuclear power station in France

Superphénix
Superphénix (; , SPX) was a nuclear power station prototype on the Rhône river at Creys-Malville in France, close to the border with Switzerland. Superphénix was a 1,242 MWe fast breeder reactor with the twin goals of reprocessing nuclear fuel from France's line of conventional nuclear reactors, while also being an economical generator of power on its own. , Superphénix remains the largest breeder reactor ever built.
Brennilis Nuclear Power Plant
nuclear power plant
Phénix
Phénix (French for phoenix) was a small-scale (gross 264/net 233 MWe) prototype fast breeder reactor, located at the Marcoule nuclear site, near Orange, France. It was a pool-type liquid-metal fast breeder reactor cooled with liquid sodium. It generated 590 MW of thermal power, and had a breeding ratio of 1.16 (16% more plutonium produced than consumed), but normally had to be stopped for refueling operations every two months. Phénix continued operating after the closure of the subsequent full-scale prototype Superphénix in 1997. After 2004, its main use was investigation of transmutation