Category
page 1Pebble bed reactors
pebble bed reactor
graphite-moderated, gas-cooled nuclear reactor
THTR-300
The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, West Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down on 1 September 1989.
The THTR-300 served as a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW (Vereinigte Elektrizitätswerke Westfalen). The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissi
AVR reactor
prototype nuclear reactor in Germany
HTR-PM
The HTR-PM () is a Chinese small modular nuclear reactor.
It is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor evolved from the HTR-10 prototype. The technology is intended to replace coal-fired power plants in China's interior, in line with the country's plan to reach carbon neutrality by 2060.
HTR-10
HTR-10 is a 10 MWt prototype high-temperature gas-cooled, pebble-bed reactor at Tsinghua University in China. Construction began in 1995, achieving its first criticality in December 2000, and was operated in full power condition in January 2003.