- Native name
- Ankara Metrosu
- Locale
- Ankara , Turkey
- Transit type
- Rapid transit
- Number of stations
- 57 (9 more under construction)
- Daily ridership
- 474,448 (average, 2025)
- Annual ridership
- Ankaray : 38.0 million (2025) , Metro : 135.2 million (2025) , Total: 173.2 million (2025)
- Website
- http://www.ego.gov.tr
- Began operation
- 1996 ; 30 years ago ( 1996 ) , 1997 ; 29 years ago ( 1997 )
- Operator s
- Electricity, Gas, Bus General Directorate (EGO)
- Number of vehicles
- 432 (108 Bombardier, 324 CRRC) , (33 AnsaldoBreda)
- System length
- 67.4 km (41.9 mi)
- Track gauge
- 1,435 mm ( 4 ft 8 + 1 ⁄ 2 in ) standard gauge
- Electrification
- 750 V DC Third rail