Bentwisch
Sign in to saveBentwisch is a municipality in the Rostock district, in Mecklenburg-Vorpommern, Germany, to the east of Rostock. Since its merger with Klein Kussewitz in January 2018, the municipality has 3,174 inhabitants and covers 29.19 square kilometres. Due to its proximity to Rostock, the B 105, and the A 19, Bentwisch became a place of industry after German reunification.
Key facts
- German location.image_coa
- Wappen Bentwisch.svg
- German location.image_plan
- Bentwisch_in_LRO.svg
- German location.image_photo
- Kirche Bentwisch.jpg
- German location.image_caption
- Church in Bentwisch
- German location.state
- Mecklenburg-Vorpommern
- German location.district
- Rostock
- German location.Amt
- Rostocker Heide
- German location.elevation
- 15
- German location.area
- 29.19
- German location.postal_code
- 18182
- German location.area_code
- 0381
- German location.licence
- LRO
- German location.Gemeindeschlüssel
- 13 0 72 012
- German location.website
- www.amt-rostocker-heide.de
- German location.mayor
- Andreas Krüger
via Wikipedia infobox
Wikidata facts
- Population
- 3575
- Area
- 29.26
- Elevation
- 18
- Official website
- www.amt-rostocker-heide.de
- Image
- Kirche Bentwisch.jpg
- Dialing code
- 0381
- Licence plate code
- DBR
Show 4 more facts
- Commons category
- Bentwisch
- postal code
- 18182
- P8168
- Videm
- hashtag
- Bentwisch
Sources (9)
via Wikidata · CC0
~1 min read
Article
2 sectionsContents
- People
- References
Bentwisch is a municipality in the Rostock district, in Mecklenburg-Vorpommern, Germany, to the east of Rostock. Since its merger with Klein Kussewitz in January 2018, the municipality has 3,174 inhabitants and covers 29.19 square kilometres. Due to its proximity to Rostock, the B 105, and the A 19, Bentwisch became a place of industry after German reunification.
Bentwisch has a substation for 220 kV/110kV and the static inverter plant of the HVDC Kontek. Both facilities are a few kilometres away from each other. In 2002 the static inverter plant Bentwisch was enlarged by a substion for 380 kV/110kV and between the static invertor plant and the 220 kV/110 kV-substation, which was built in difference to the static invertor plant at times, East Germany existed, a 110 kV powerline for 3 phase AC was built.
On the map
3 mapped locations