Grand Coulee Dam
Sign in to saveconcrete hydroelectric gravity dam on the Columbia River in Washington, United States
Key facts
- Country
- United States
- Location
- Grant and Okanogan counties, Washington
- Purpose
- Power, regulation, irrigation
- Status
- Operational
- Construction began
- July 16, 1933 , (92 years ago) ( 1933-07-16 )
- Opening date
- June 1, 1942 , (84 years ago) ( 1942-06-01 )
- Construction cost
- Original dam: $163 million 1943 , Third powerplant: $730 million 1973
- Operator
- Bureau of Reclamation
- Type of dam
- Concrete gravity
- Impounds
- Columbia River
- Height
- 550 ft (168 m)
- Length
- 5,223 feet (1,592 m)
- Width crest
- 30 ft (9 m)
- Width base
- 500 ft (152 m)
- Dam volume
- 11,975,520 cu yd (9,155,942 m )
- Spillway type
- Service, drum gate
- Spillway capacity
- 1,000,000 cu ft/s (28,317 m /s)
- Creates
- Franklin Delano Roosevelt Lake Banks Lake
via Wikipedia infobox
Wikidata facts
- Instance of
- pumped-storage power station
- Country
- United States
- Located in
- Grant County
- Official website
- www.usbr.gov/pn/grandcoulee
- Image
- Grand Coulee Dam.jpg
- Length
- 1592
Show 9 more facts
- Commons category
- Grand Coulee Dam
- located in/on physical feature
- Columbia River
- inception
- 1941-01-01
- reservoir created
- Franklin D. Roosevelt Lake
- drainage basin
- Columbia Basin
- hydraulic head
- 380
- capital cost
- 1860000000
- nominal power output
- 6809
- native label
- Grand Coulee Dam
via Wikidata · CC0
~40 min read
Encyclopedic overview
Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington, built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had two powerhouses. The third powerhouse ("Nat"), completed in 1974 to increase energy production, makes Grand Coulee the largest power station in the United States by nameplate capacity at 6,809 MW.
The proposal to build the dam was the focus of intense debate during the 1920s between two groups. One group wanted to irrigate the ancient Grand Coulee with a gravity canal while the other pursued a high dam and pumping scheme. The dam supporters won in 1933, but, although they fully intended otherwise, the initial proposal by the Bureau of Reclamation was for a "low dam" 290 feet (88 m) tall which would generate electricity without supporting irrigation. That year, the U.S. Bureau of Reclamation and a consortium of three companies called MWAK (Mason-Walsh-Atkinson Kier Company) began construction on a high dam, although they had received approval for a low dam. After visiting the construction site in August 1934, President Franklin Delano Roosevelt endorsed the "high dam" design, which at 550 ft (168 m) high would provide enough electricity to pump water into the Columbia basin for irrigation. Congress approved the high dam in 1935, and it was completed in 1942. The first waters overtopped Grand Coulee's spillway on June 1 of that year.
Excerpted from Wikipedia’s “Grand Coulee Dam” article, available under the CC BY-SA 4.0 licence.