Grand Coulee Dam

Sign in to save

concrete hydroelectric gravity dam on the Columbia River in Washington, United States

Key facts

Country
United States
Location
Grant and Okanogan counties, Washington
Purpose
Power, regulation, irrigation
Status
Operational
Construction began
July 16, 1933 , (92 years ago) ( 1933-07-16 )
Opening date
June 1, 1942 , (84 years ago) ( 1942-06-01 )
Construction cost
Original dam: $163 million 1943 , Third powerplant: $730 million 1973
Operator
Bureau of Reclamation
Type of dam
Concrete gravity
Impounds
Columbia River
Height
550 ft (168 m)
Length
5,223 feet (1,592 m)
Width crest
30 ft (9 m)
Width base
500 ft (152 m)
Dam volume
11,975,520 cu yd (9,155,942 m )
Spillway type
Service, drum gate
Spillway capacity
1,000,000 cu ft/s (28,317 m /s)
Creates
Franklin Delano Roosevelt Lake Banks Lake

via Wikipedia infobox

Wikidata facts

Located in
Grant County
Image
Grand Coulee Dam.jpg
Length
1592
Show 9 more facts
Commons category
Grand Coulee Dam
located in/on physical feature
Columbia River
inception
1941-01-01
drainage basin
Columbia Basin
hydraulic head
380
capital cost
1860000000
nominal power output
6809
native label
Grand Coulee Dam
Sources (4)

via Wikidata · CC0

~40 min read

Encyclopedic overview

Grand Coulee Dam is a concrete gravity dam on the Columbia River in the U.S. state of Washington, built to produce hydroelectric power and provide irrigation water. Constructed between 1933 and 1942, Grand Coulee originally had two powerhouses. The third powerhouse ("Nat"), completed in 1974 to increase energy production, makes Grand Coulee the largest power station in the United States by nameplate capacity at 6,809 MW.

The proposal to build the dam was the focus of intense debate during the 1920s between two groups. One group wanted to irrigate the ancient Grand Coulee with a gravity canal while the other pursued a high dam and pumping scheme. The dam supporters won in 1933, but, although they fully intended otherwise, the initial proposal by the Bureau of Reclamation was for a "low dam" 290 feet (88 m) tall which would generate electricity without supporting irrigation. That year, the U.S. Bureau of Reclamation and a consortium of three companies called MWAK (Mason-Walsh-Atkinson Kier Company) began construction on a high dam, although they had received approval for a low dam. After visiting the construction site in August 1934, President Franklin Delano Roosevelt endorsed the "high dam" design, which at 550 ft (168 m) high would provide enough electricity to pump water into the Columbia basin for irrigation. Congress approved the high dam in 1935, and it was completed in 1942. The first waters overtopped Grand Coulee's spillway on June 1 of that year.

Excerpted from Wikipedia’s “Grand Coulee Dam” article, available under the CC BY-SA 4.0 licence.