Haringvlietdam
EntityQ1585379· pop 11· linked from 19 articles

Haringvlietdam

Sign in to save

The Haringvlietdam, incorporating the Haringvliet sluices, are hydraulic engineering structures which closed off the estuary of the Haringvliet, Netherlands, as part of the Delta Works. The structure consists of 17 sluices, several kilometres of dam and a shipping lock, and formed the sixth project of the Delta Works.

In the Vinony graph

Vinony's link graph records 19 inbound references to Haringvlietdam, and connects out to Netherlands, fish and North Sea.

The entry is geolocated on the map in landmark, across 2 mapped points.

Vinony files it under Dams completed in 1971, Dams in South Holland and Delta Works.

Vinony links it to 10 Wikipedia language editions.

Key facts

Bridge.bridge_name
Haringvlietdam
Bridge.image
HARINGVLIETDAM (20).jpg
Bridge.carries
N57
Bridge.crosses
haringvliet
Bridge.locale
Voorne-Putten, Goeree-Overflakkee
Bridge.owner
Rijkswaterstaat
Bridge.material
Concrete, steel
Bridge.spans
17
Bridge.begin
1958
Bridge.complete
1971
Bridge.inaugurated
15 November 1971

via Wikipedia infobox

Wikidata facts

Instance of
lock
Named after
Haringvliet
Located in
Voorne aan Zee
Body of water
North Sea
Material used
concrete
Location
Stellendam
Image
Haringvlietdam-02.jpg
Show 7 more facts
Commons category
Haringvlietdam
heritage designation
Rijksmonument
number of spans
17
street address
Haringvliet, tussen Stellendam en Hellevoetsluis te HELLEVOETSLUIS
located in/on physical feature
Haringvliet
inception
1964-00-00
Sources (3)

via Wikidata · CC0

~2 min read

Encyclopedic overview

2 sections
Contents
  • References
  • External links

The Haringvlietdam, incorporating the Haringvliet sluices, are hydraulic engineering structures which closed off the estuary of the Haringvliet, Netherlands, as part of the Delta Works. The structure consists of 17 sluices, several kilometres of dam and a shipping lock, and formed the sixth project of the Delta Works.

The northernmost of the Delta Works, it was supposed to be finished by 1968 as the first part of the project. Building started in 1957 and was finished in 1971. Instead of damming the estuary it was decided to build sluices in order to be able to let in salt water to prevent freezing of the rivers Meuse and Rhine and to drain these rivers in case of flood.

Excerpted from Wikipedia’s “Haringvlietdam” article, available under the CC BY-SA 4.0 licence.