File:Principality_Stadium_Logo_2016.svg · Wikimedia Commons · See Wikimedia Commons
Millennium Stadium
Sign in to saveAlso known as Stadiwm y Mileniwm, Principality Stadium, The Millennium Stadium
national stadium of Wales
Key facts
- Former names
- Millennium Stadium Stadiwm y Mileniwm National Stadium of Wales ( UEFA competitions only) Stadiwm Genedlaethol Cymru
- Location
- Westgate Street, Cardiff, CF10 1NS
- Owner
- Millennium Stadium plc ( Welsh Rugby Union )
- Operator
- Millennium Stadium plc ( Welsh Rugby Union )
- Capacity
- 73,931 (rugby union and football) , 78,000 (boxing)
- Roof
- Retractable
- Surface
- Grass (1999–2014), GrassMaster (2014–present)
- Field size
- 120 m × 79 m (394 ft × 259 ft)
- Public transit
- Cardiff Central
- Built
- 1997–1999
- Opened
- 26 June 1999 ; 26 years ago ( 1999-06-26 )
- Construction cost
- £ 114–121 million
- Architect
- Bligh Lobb Sports Architecture
- Structural engineer
- WS Atkins
- Main contractors
- Laing
via Wikipedia infobox
~33 min read
Encyclopedic overview
The Millennium Stadium (Welsh: Stadiwm y Mileniwm), known since 2016 as the Principality Stadium (Welsh: Stadiwm Principality) for sponsorship reasons, is the national stadium of Wales in Cardiff. It has a retractable roof and a usual capacity of 73,931. It is the home of the Wales national rugby union team and has also held Wales national football team games. Initially built to host the 1999 Rugby World Cup and replacing the National Stadium on the site known as Cardiff Arms Park, it has hosted other events including the Tsunami Relief Cardiff concert, the Super Special Stage of Wales Rally Great Britain, the Speedway Grand Prix of Great Britain and various concerts. It also hosted FA Cup, League Cup and Football League play-off finals while Wembley Stadium was being redeveloped between 2001 and 2006, as well as football matches during the 2012 Summer Olympics.
The stadium is owned by Millennium Stadium plc, a subsidiary company of the Welsh Rugby Union (WRU). The architects were Bligh Lobb Sports Architecture. The structural engineers were WS Atkins and the building contractor was Laing. The total construction cost of the stadium was £121million, of which the Millennium Commission funded £46 million.
Excerpted from Wikipedia’s “Millennium Stadium” article, available under the CC BY-SA 4.0 licence.