NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produce
via Wikipedia infobox
NorNed is a long high-voltage direct current submarine power cable between Feda, Norway and the seaport of Eemshaven in the Netherlands, which interconnects both countries' electrical grids. It was once the longest submarine power cable in the world. Budgeted at €550 million, and completed at a cost of €600m, the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced by ABB.
== History == Installation of the first sections started in early 2006 and the final section was laid by the end of 2007. On the Dutch shore, TenneT has connected the cable to the 380 kV Dutch high‑voltage grid. In Feda, Statnett has done the same for the 300 kV Norwegian transmission grid. Commercial operation started on 5 May 2008 with a capacity auction. The first commercial power transfer took place on 6 May 2008.
Discovered by embedding cosine similarity (sentence-transformers MiniLM, 384-dim).