The Statpipe pipeline is a natural gas system, which links northern North Sea gas fields with Norway's gas export system. It transports gas from Statfjord, Gullfaks, Heimdal, Veslefrikk, Snorre, Brage and Tordis gas fields.
The Statpipe pipeline is a natural gas system, which links northern North Sea gas fields with Norway's gas export system. It transports gas from Statfjord, Gullfaks, Heimdal, Veslefrikk, Snorre, Brage and Tordis gas fields.
==History== The Statpipe was developed by Statoil. The development plan was approved by the Norwegian Parliament (Storting) on 10 June 1981. The rich gas pipeline from Statfjord became operational on 25 March 1985 and the dry gas pipeline from Kårstø to Ekofisk field came on stream on 15 October 1985. The Draupner S riser platform was installed in 1984 as part of the Statpipe system. In 1998, the Statpipe was connected directly with the Norpipe. On 1 January 2003, the Statpipe was merged into Gassled partnership and Gassco became the operator of the pipeline.
Discovered by embedding cosine similarity (sentence-transformers MiniLM, 384-dim).