Skip to content
EntityQ684927· pop 32· linked from 55 articles

Gotthard Road Tunnel

Sign in to save

road tunnel in Switzerland

Key facts

Location
Switzerland
Route
A2
Start
Göschenen , Uri (north)
End
Airolo , Ticino (south)
Constructed
5 May 1970 ( 1970-05-05 )
Opened
5 September 1980 ( 1980-09-05 )
Owner
Swiss Confederation
Operator
Amt für Betrieb der Nationalstrassen of the cantons of Uri , Ticino , Nidwalden , and Schwyz
Traffic
Automotive
Toll
none (included in the mandatory Vignette )
Vehicles per day
17354 (2014)
Length
16.942 kilometres (10.527 mi)
Operating speed
80 km/h (50 mph)
Highest elevation
1,175 m (3,855 ft) , (inside the tunnel)
Lowest elevation
1,080 m (3,540 ft) , (north portal)

via Wikipedia infobox

Official website

AfBN - Strassentunnel

gotthard-strassentunnel.ch →

Link to the official site · 18,670 chars · not written by Vinony

Wikidata facts

Owned by
Switzerland
Location
Switzerland
Image
Gotthard-Strassentunnel Nord-Süd-8915.jpg
Length
16900
Show 7 more facts
Commons category
Gotthard Road Tunnel
carries thoroughfare
A2 motorway
terminus
Göschenen
terminus location
Airolo
date of official opening
1980-00-00
inception
1980-01-01
Sources (5)

via Wikidata · CC0

~8 min read

Encyclopedic overview

The Gotthard Road Tunnel in Switzerland runs from Göschenen in the canton of Uri at its northern portal, to Airolo in Ticino to the south, and is 16.9 kilometres (10.5 mi) in length below the St Gotthard Pass, a major pass of the Alps. At time of construction, in 1980, it was the longest road tunnel in the world; it is currently the seventh-longest. Although it is a motorway tunnel, part of the A2 from Basel to Chiasso, it consists of only one bidirectional tube with two lanes. With a maximum elevation of 1,175 metres (3,855 ft) at the tunnel's highest point, the A2 motorway has the lowest maximum elevation of any direct north-south road through the Alps.

The tunnel rises from the northern portal at Göschenen (1,080 m (3,540 ft)) and the culminating point is reached after approximately 8 kilometres (5.0 mi). After 10.3 kilometres (6.4 mi) from the northern portal there is the border between the cantons of Uri and Ticino; after another 6.7 kilometres (4.2 mi), the tunnel ends at the southern portal near Airolo (1,146 m (3,760 ft)). The journey takes about 13 minutes by car, the maximum speed being 80 km/h (50 mph).

Excerpted from Wikipedia’s “Gotthard Road Tunnel” article, available under the CC BY-SA 4.0 licence.

On the map