Gotthard Tunnel
Sign in to saverailway tunnel in Switzerland
Key facts
- Official name
- German : Gotthardtunnel , Italian : Galleria del San Gottardo
- Line
- Gotthard Line
- Location
- Traversing the Saint-Gotthard Massif in the middle of the Swiss Alps
- System
- Swiss Federal Railways (SBB CFF FFS)
- Start
- Göschenen , canton of Uri (north, 1,106 m or 3,629 ft)
- End
- Airolo , canton of Ticino (south, 1,145 m or 3,757 ft)
- Work began
- September 13, 1872 ( 1872-09-13 )
- Opened
- June 1, 1882 ( 1882-06-01 )
- Owner
- SBB CFF FFS
- Operator
- SBB Infrastructure
- Traffic
- railway
- Character
- passenger, freight
- Design engineer
- Louis Favre
- Length
- 15,002.64 m (9.32221 mi)
- Number span no of tracks
- Double
- Track gauge
- 1,435 mm ( 4 ft 8 + 1 ⁄ 2 in ) ( standard gauge )
- Electrified
- 15 kV 16.7 Hz since September 18, 1920 ( 1920-09-18 )
- Highest elevation
- 1,151 m (3,776 ft) , (inside the tunnel)
via Wikipedia infobox
Wikidata facts
- Country
- Switzerland
- Located in
- Göschenen
- Operator
- Swiss Federal Railways
- Image
- Goeschenen nordportal.jpg
- Length
- 15.003
Show 10 more facts
- Commons category
- Gotthard rail tunnel
- track gauge
- standard-gauge railway
- crosses
- Saint-Gotthard Massif
- terminus
- Göschenen
- structural engineer
- Louis Favre
- carries thoroughfare
- Gotthard railway
- terminus location
- Göschenen
- inception
- 1882-05-22
- date of official opening
- 1881-00-00
- different from
- Gotthard Base Tunnel
via Wikidata · CC0
~13 min read
Encyclopedic overview
The Gotthard Tunnel (German: Gotthardtunnel, Italian: Galleria del San Gottardo) is a 15-kilometre-long (9.3 mi) railway tunnel that forms the summit of the Gotthard Railway in Switzerland. It connects Göschenen with Airolo and was the first tunnel through the Saint-Gotthard Massif in order to bypass the St Gotthard Pass. It was built as single bore tunnel accommodating a standard gauge double-track railway throughout. When opened in 1882, the Gotthard Tunnel was the longest tunnel in the world.
The tunnel rises from the northern portal at Göschenen (1,106 m or 3,629 ft) and the highest point (1,151 m or 3,776 ft) is reached after approximately eight kilometres (5 mi). After two more kilometers, the border between the cantons of Uri and Ticino is passed; after another five kilometres (3 mi), the tunnel ends at the southern portal near to Airolo (1,142 m or 3,747 ft). The trip takes about seven to eight minutes by train. Services are operated by the Swiss Federal Railways.