- Name
- Ohio class
- Builders
- General Dynamics Electric Boat
- Operators
- United States Navy
- Preceded by
- Benjamin Franklin class
- Succeeded by
- Columbia class (ballistic missile submarine variant) Virginia class (cruise missile submarine variant)
- Cost
- $2 billion (late 1990s) ($3.62 billion in 2024 dollars )
- Built
- 1976–1997
- In commission
- 1981–present
- Type
- SSBN / SSGN (hull design SCB-304)
- Displacement
- 16,764 tonnes (16,499 long tons) surfaced 18,750 tonnes (18,450 long tons) submerged
- Length
- 560 ft (170 m)
- Beam
- 42 ft (13 m)