
Space Launch System
Sign in to saveAlso known as SLS
lanceur spatial lourd américain développé par la NASA depuis 2011
Wikipedia views (30d)
60,921 totalvia Wikimedia Pageviews API
Key facts
- Function
- Super heavy-lift launch vehicle
- Manufacturer
- Aerojet Rocketdyne Boeing Northrop Grumman United Launch Alliance
- Country of origin
- United States
- Project cost
- US$ 31.6 billion as of 2025 (excluding Orion)
- Cost per launch
- US$2.5 billion (excluding Orion)
- Cost per year
- US$2.6 billion ( FY 23) (excluding Orion)
- Height
- 98 m (322 ft)
- Diameter
- 8.4 m (27.6 ft)
- Mass
- 2,610,000 kg (5,750,000 lb)
- Stages
- 2½
- Maximum thrust
- 39 MN (8,800,000 lbf)
- Altitude
- 200 km (120 mi)
- Orbital inclination
- 28.5°
- Based on
- Ares V Delta IV Space Shuttle
- Comparable
- Energia Falcon Heavy Long March 9 N1 Saturn V Starship
- Status
- Active
- Launch sites
- Kennedy , LC-39B
- First flight
- November 16, 2022
via Wikipedia infobox
Official website

Space Launch System (SLS) - NASA
Combining power and capability, NASA’s Space Launch System (SLS) rocket is part of NASA’s backbone for deep space exploration and Artemis.
nasa.gov →NASA explores the unknown in air and space, innovates for the benefit of humanity, and inspires the world through discovery. Technicians inside the Payload Hazardous Servicing Facility at Kennedy Space Center in Florida install and test antennas on a solar array on Wednesday, March 20, 2024, for the agency’s Europa Clipper spacecraft. NASA’s future will continue to be a story of human exploration, technology, and science. We will go back to the Moon to learn more about what it will take to support human exploration to Mars and beyond. We will continue to nurture the development of a vibrant low-Earth orbit economy that builds on the work done to date by the International Space Station. NASA engineers will develop new technologies to improve air transport at home and meet the challenges of advanced space exploration. Our scientists will work to increase an understanding of our planet and our place in the universe. The Artemis II crew, from left: NASA astronauts Reid Wiseman and Christina Koch; CSA (Canadian Space Agency) astronaut Jeremy Hansen; and NASA astronaut Victor Glover pose for a group photo after viewing the Orion spacecraft in the well deck of the USS John P. Murtha, Saturday, April 11, 2026, in the Pacific Ocean off the coast of California. When NASA opened for business on October 1, 1958, it accelerated the work already started on human and robotic spaceflight, and over the last 65 years it has continued to push the boundaries of aeronautics and space exploration. Now NASA is preparing to take humankind farther than ever before, as it helps to foster a robust commercial space economy near Earth, and pioneers further human and robotic exploration as we venture into deep space. NASA’s Perseverance Mars rover took a selfie with the Ingenuity helicopter, seen here about 13 feet from the rover. This image was taken by the WASTON camera on the rover’s robotic arm on April 6, 2021, the 46th Martian day, or sol, of the mission. Jared “Rook” Isaacman is the 15th Administrator of the National Aeronautics and Space Administration. An entrepreneur and skilled pilot, Isaacman commanded Inspiration4, the first all-civilian orbital spaceflight aboard the Dragon spacecraft. The mission was a major milestone in commercial spaceflight. Matt Anderson is NASA’s deputy administrator. Anderson is a decorated Air Force command pilot in multiple aircraft with more than 5,000 flight hours, including more than 650 in combat. Throughout his 24-year Air Force career, he served on several senior U.S. Department of War staffs and commanded at multiple levels before retiring in 2021. Amit Kshatriya is NASA’s associate administrator. Kshatriya serves as the highest-ranking civil servant at the agency and as a senior advisor to the administrator. Kshatriya leads the agency’s 10 center directors, as well as the mission directorate associate administrators at NASA Headquarters in Washington. Align your talents with your passion and find out why NASA consistently is named a best place to work in the federal government. At NASA, you'll have an opportunity to work on unique and challenging projects that truly make an impact on humanity. Stay up-to-date on the latest news from NASA–from Earth to the Moon, the Solar System and beyond.
Read more on their site →Excerpt from the official site · 37,009 chars · not written by Vinony
Wikidata facts
- Subclass of
- super heavy-lift launch vehicle
- Operator
- NASA
- Country of origin
- United States
- Official website
- www.nasa.gov/humans-in-space/space-launch-system
- Image
- Artemis II launch (SLS MAF 20260401 ArtemisIILaunch 02) crop.jpg
- Has parts of class
- Exploration Upper Stage
Show 4 more facts
- Commons category
- Space Launch System
- topic's main category
- Category:Space Launch System
- social media followers
- 634427
- capital cost
- 2550000000
Sources (2)
via Wikidata · CC0
Article · Français
Le Space Launch System (litt. « système de lancement spatial »), abrégé SLS, est un lanceur spatial super-lourd américain développé par la NASA depuis 2011 et dont le premier vol a lieu le 16 novembre 2022. Le SLS joue un rôle central dans le programme Artemis dont l'objectif est, 50 ans après le programme Apollo, d'envoyer de nouveau des équipages à la surface de la Lune, puis de préparer les futures missions habitées vers Mars. Cette fusée sera chargée de placer le vaisseau Orion transportant l'équipage sur une trajectoire à destination de la Lune. Pour placer en orbite lunaire un vaisseau avec équipage d'une masse de près de 30 tonnes, il faut disposer d'un lanceur beaucoup plus puissant que ceux actuellement disponibles. Le lanceur Saturn V du programme Apollo, d'une capacité de 47 tonnes en orbite lunaire, n'est plus produit depuis la fin de ce programme au début des années 1970. L'architecture du lanceur SLS, similaire à celle de l'Ares V abandonné après l'arrêt du programme Constellation en 2010, reprend en les adaptant des composants utilisés par la navette spatiale américaine (propulseurs d'appoint, moteurs-fusées SSME/RS-25) et dans sa version Bloc 1 l'étage supérieur du lanceur Delta IV. Plusieurs versions sont envisagées (Bloc 1, 1B et 2), d'une capacité de mise en orbite terrestre basse s'échelonnant entre 70 tonnes et 130 tonnes. La version Bloc 1, pouvant lancer 28 tonnes vers la Lune, est caractérisée par son deuxième étage ICPS, propulsé par un unique moteur RL-10 B2. Courant 2020, seule cette version est développée. Actuellement, aucun budget n'est disponible pour finaliser les versions 1B et 2, principalement caractérisées par un deuxième étage et des propulseurs d'appoint plus puissants. Le développement de la fusée SLS est lancé en 2011 à la demande du Congrès américain alors que la NASA n'a exprimé aucun besoin précis. Le coût initial du projet est alors évalué à 10 milliards US$ et un premier vol est prévu en 2017. Les glissements de ce calendrier, les importants dépassements budgétaires qui touchent également l'adaptation des installations de lancement du complexe de lancement 39 en Floride ainsi que le développement de lanceurs commerciaux de forte puissance remettent en question la nécessité d'un lanceur dont le coût unitaire de production atteint 2,2 milliards de US$. Malgré tout, sous la pression du Congrès, le projet se poursuit et le lanceur est appelé à jouer un rôle central dans le programme Artemis.
Abstract from DBpedia / Wikipedia · CC BY-SA