Skip to content
STS-127
EntityQ752792· pop 34· linked from 437 articles

Also known as Space Transportation System 127, ISS Assembly Flight 2J/A, 2J/A

STS-127 (ISS assembly flight 2J/A) was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of . The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility (JEM EF), and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. To

Key facts

Spaceflight.name
STS-127
Spaceflight.names_list
Space Transportation System-127
Spaceflight.image
STS-127 JEM-EF.jpg
Spaceflight.image_caption
Canadarm2 grapples the exposed facility of Kibō, prior to its installation on the ISS
Spaceflight.insignia
STS-127 Patch.svg
Spaceflight.mission_type
ISS assembly
Spaceflight.operator
NASA
Spaceflight.orbits_completed
248
Spaceflight.mission_duration
15days, 16hours, 44minutes, 58seconds
Spaceflight.launch_site
Kennedy, LC-39A
Spaceflight.launch_date
 UTC
Spaceflight.landing_date
 UTC
Spaceflight.landing_site
Kennedy, SLF Runway 15
Spaceflight.crew_size
7
Spaceflight.crew_photo
STS-127 Crew Photo.jpg
Spaceflight.crew_photo_caption
From left to right: Wolf, Cassidy, Hurley, Payette, Polansky, Marshburn, and Kopra
Spaceflight.apsis
gee
Spaceflight.orbit_epoch
July 18, 2009

via Wikipedia infobox

Wikidata facts

Duration
1356363
Mass
13645
Orbital period
91.48
Image
Endeavour from ISS before docking.jpg
Show 9 more facts
Commons category
STS-127
UTC date of spacecraft launch
2009-07-15
orbits completed
248
Commons gallery
STS-127
orbital inclination
51.6
periapsis
344
apoapsis
351
maximum capacity
7
UTC date of spacecraft landing
2009-07-31
Sources (4)

via Wikidata · CC0

~31 min read

Article

30 sections
Contents
  • Crew
  • Crew seat assignments
  • Mission payload
  • Mission milestones
  • Shuttle processing
  • Launch attempts
  • Mission timeline
  • July 15 (Flight Day 1, Launch)
  • July 16 (Flight Day 2)
  • July 17 (Flight Day 3, ISS Docking)
  • July 18 (Flight Day 4, EVA 1)
  • July 19 (Flight Day 5)
  • July 20 (Flight Day 6, EVA 2)
  • July 21 (Flight Day 7)
  • July 22 (Flight Day 8, EVA 3)
  • July 23 (Flight Day 9)
  • July 24 (Flight Day 10, EVA 4)
  • July 25 (Flight Day 11)
  • July 26 (Flight Day 12)
  • July 27 (Flight Day 13, EVA 5)
  • July 28 (Flight Day 14, ISS Undocking)
  • July 29 (Flight Day 15)
  • July 30 (Flight Day 16)
  • July 31 (Flight Day 17, Landing)
  • EVAs
  • Wake-up calls
  • See also
  • Media
  • References
  • External links

STS-127 (ISS assembly flight 2J/A) was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of . The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility (JEM EF), and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995.

The first launch attempt, on June 13, 2009, was scrubbed due to a gaseous hydrogen leak observed during tanking. The Ground Umbilical Carrier Plate (GUCP) on the external fuel tank experienced a potentially hazardous hydrogen gas leak similar to the fault that delayed the mission STS-119 in March 2009. Since a launch date of June 18, 2009, would have conflicted with the launch of the Lunar Reconnaissance Orbiter (LRO)/Lunar Crater Observation and Sensing Satellite (LCROSS), NASA managers discussed the scheduling conflict with both the Lunar Reconnaissance Orbiter project and the Air Force Eastern Range, which provides tracking support for rockets launched from Florida. A decision was made to allow the shuttle to attempt a second launch on June 17, 2009, allowing LRO to launch on June 18, 2009.

Gallery (13)

Connections

Categories